Wednesday, December 25, 2013

Project 8: Performance Night "The Lost Kingdoms"

FINALLY~~~ Sem 1 has come to an end... And our final project ....performance night? Kinda special right? :D

The theme of the performance night >>>>>The Lost Kingdoms<<<<<
 Every majors represents one of the Lost Kingdoms, and there are 7 Big Kingdoms.
For our construction management,we are representing Demak Kingdom..
However, our CM has decide to performs traditional dances and the drama about the lost of the Kingdom Demak..
RUS 104 NIGHT

During drama practice

I'm being killed!! x.X


THE ACTOR?? Unbelievable!!! Haha
AND THAT'S END OF OUR PROJECTS DURING SEMESTER 1~~

Project 7: XZHIBITION 2013


The XZbition was held from 16-20 December 2013( around 5 days). This project is totally different compare to the previous.. The main purpose of this project is to exhibit the projects that we had done from previous which is project 1- project 6...

Banner of RUS104 XZbition 2013

The booth of Construction Management :D

BANNER of Construction Management :)

The Booth.........

Project 6c: Physical Scale Model

§  Based on our Amphiteatre Stage design, we need to build or construct the scale size model of their stage (1:5 scale).
HHowever, we are given two weeks of time to plan and make the Amphiteatre Stage.

Our model of the stage is under the lead of material team where Syakirin are the leader.

During this two week, we have faced some hard problems and luckily those problems are solved by the teamwork of everyone.




with lighting system.

Project 6: Integrated Project: Design Of Amphitheatre stage

In this project,everyone of us had divided into 12 new groups where everyone come from different majors.
Where we were asked to design our own amphitheatre stage and pass up progress report every week.
Our amphitheatre stage designed by our group leader Ikhwan who are from architecture.
The LOGO


Thursday, October 31, 2013

Project 5: sense of place: neighbourhood & community

For project 5, we are required to choose a site from 6 sites given by lecturers and do the site analysis. The results is then used insert into 2 A2 size cartridge papers.


In the process

Project 5a: Existing Condition
 In 5a, there are few important information which is included in it. Key plan, location plan and layout plan and also the sun path, prevailing wind, vehicular circulation and etc which is inserted in project 5a.

Project 5b: Proposed Improvement
For 5b, we were given a task to do a proposed improvement on Siara 81.

Sunday, October 20, 2013

Project 4: Presentation Drawing

In this project, we were asked to draw 2 presentation drawings which consist 2D( plan, front, rear, left and right) and 3D( perspective and axonometric drawing). the aim of the project is to enhance students’ skills in communicating the ideas and presenting their design through a set of scaled 2D and 3D drawings.
The Blueprint..

Axonometric...
Final product~

Sunday, October 13, 2013

Project 3B: Object Connection

In this project, we are divide into group of 3 or 4 and design a L shape chair. However the design of the winner will be used to build a real chair and place outside the office. So my group members and me decided to design a simple L shape chair. The material of the model used are wood.
before color

after colored

Followers