Wednesday, December 25, 2013

Project 8: Performance Night "The Lost Kingdoms"

FINALLY~~~ Sem 1 has come to an end... And our final project ....performance night? Kinda special right? :D

The theme of the performance night >>>>>The Lost Kingdoms<<<<<
 Every majors represents one of the Lost Kingdoms, and there are 7 Big Kingdoms.
For our construction management,we are representing Demak Kingdom..
However, our CM has decide to performs traditional dances and the drama about the lost of the Kingdom Demak..
RUS 104 NIGHT

During drama practice

I'm being killed!! x.X


THE ACTOR?? Unbelievable!!! Haha
AND THAT'S END OF OUR PROJECTS DURING SEMESTER 1~~

Project 7: XZHIBITION 2013


The XZbition was held from 16-20 December 2013( around 5 days). This project is totally different compare to the previous.. The main purpose of this project is to exhibit the projects that we had done from previous which is project 1- project 6...

Banner of RUS104 XZbition 2013

The booth of Construction Management :D

BANNER of Construction Management :)

The Booth.........

Project 6c: Physical Scale Model

§  Based on our Amphiteatre Stage design, we need to build or construct the scale size model of their stage (1:5 scale).
HHowever, we are given two weeks of time to plan and make the Amphiteatre Stage.

Our model of the stage is under the lead of material team where Syakirin are the leader.

During this two week, we have faced some hard problems and luckily those problems are solved by the teamwork of everyone.




with lighting system.

Project 6: Integrated Project: Design Of Amphitheatre stage

In this project,everyone of us had divided into 12 new groups where everyone come from different majors.
Where we were asked to design our own amphitheatre stage and pass up progress report every week.
Our amphitheatre stage designed by our group leader Ikhwan who are from architecture.
The LOGO


Thursday, October 31, 2013

Project 5: sense of place: neighbourhood & community

For project 5, we are required to choose a site from 6 sites given by lecturers and do the site analysis. The results is then used insert into 2 A2 size cartridge papers.


In the process

Project 5a: Existing Condition
 In 5a, there are few important information which is included in it. Key plan, location plan and layout plan and also the sun path, prevailing wind, vehicular circulation and etc which is inserted in project 5a.

Project 5b: Proposed Improvement
For 5b, we were given a task to do a proposed improvement on Siara 81.

Sunday, October 20, 2013

Project 4: Presentation Drawing

In this project, we were asked to draw 2 presentation drawings which consist 2D( plan, front, rear, left and right) and 3D( perspective and axonometric drawing). the aim of the project is to enhance students’ skills in communicating the ideas and presenting their design through a set of scaled 2D and 3D drawings.
The Blueprint..

Axonometric...
Final product~

Sunday, October 13, 2013

Project 3B: Object Connection

In this project, we are divide into group of 3 or 4 and design a L shape chair. However the design of the winner will be used to build a real chair and place outside the office. So my group members and me decided to design a simple L shape chair. The material of the model used are wood.
before color

after colored

Sunday, October 6, 2013

Project 3A: Free Form Sculpture

For project 3A, we are request to make a free form sculpture by using any materials and the sculpture with the theme "harmony".

Blackbirds live together and they showed the harmony. Therefore,i planned to make a blackbird as my free form sculpture. I decided to use thin steel wire to make my blackbird sculpture.
However,my final sculpture is not what i expected to be. It's totally different compare to the photo above....
Blue color has been chosen as my blackbird color as blue represent the color of sea and sky. A harmony feel has been given to us.

Sunday, September 29, 2013

Project 2: Natural & Man-Made structure

The second project issued, everyone of us are given a task to snapshot a natural structure and man made structure and sketch them into a A3 paper. the purpose of project 2 is to understanding the basic elements and principles of design.
natural structure

sketch natural structure

photo of man made structure
sketch man made structure


Sunday, September 22, 2013

Project 1: Me, Myself & I

After a week of orientation, our uni life have started. On 9 September 2013,we are giving the very very first project. Everyone of us are request to sketch our own face for project 1a and design our own personal logo for project 1b.













 After a few days of hardwork, and finally my first project completed. The first photo on right is my project 1a and project 1b for second photo.










For my personal logo, the letter M and K represent me myself and the arrows mean to move on and stay ahead. However, NEVER NEVER GIVE UP has been chosen by me as my tagline. There is someone who told me to not give up even facing a big and hard problem.

Friday, September 13, 2013

31/8/2013

It was a kinda sad day for me. Because i'm leaving my lovely hometown,Miri for my further study at USM,Penang.

 
 
















PHOTO 1:    With my mum before leaving... :)















PHOTO 2:    And a group of sisters in church :D



















PHOTO 3:    So,these are my friends who came Penang together with me :))



















PHOTO 4:    And finally i'm here USM!! The Desasiswa RST... :)










Followers